There was evidence of damage to concrete slabs on expressway S1 near Vienna (e.g. cracks and broken edges) requiring repair. To minimise traffic disruption due to repairs, the works were carried out at night using rapid-hardening concrete.
The rapid-hardening concrete Concretum® Q-FLASH 2/20 was used for this project. It reaches a compressive strength of over 20 N/mm2 just 2 hours after the start of mixing. This enabled the construction work to be completed within this very limited time frame. The concrete was produced in a nearby concrete plant and then transported to the site with a mixer truck. As the open time for the concrete could be adjusted precisely, it was possible to repair several small surfaces in succession with just one concrete production batch.
Thanks to the rapid hardening of the concrete, traffic disruption was kept to a minimum.
Product
Country
Austria
Construction Period
2015
Client
ASFINAG
Construction Company
ÖBA
Concrete Producer
Asamer,Vienna
Field of application
Rapid hardening concrete, Highways, Infrastructure
Paving method
Manual paving