An overview of our products. More detailed information can be found on the respective product pages of Q-FLASH 2/20, Q-FLASH 5/20, Q-CON and Q-REP G.
Products | Runway | Taxiways | Stands | Apron | Highways | Bridge renovation | Retaining walls | Piles | Bridge joints | small local repairs | Joint repairs | Building Construction |
---|---|---|---|
Q-FLASH 2/20 Cast-in-place concrete |
Q-FLASH 5/20 Cast-in-place concrete |
Q-CON Bagged goods |
Q-REP G Bagged goods |
Products | Description | Specification | Compressive strength of 20 N/mm2 | Open time | Drying < 4 CM-% | Slab / Element thickness | Production | Placement type | Production output | Minimum quantities per application | Packaging |
---|---|---|---|
Q-FLASH 2/20 Cast-in-place concrete |
Q-FLASH 5/20 Cast-in-place concrete |
Q-CON Bagged goods |
Q-REP G Bagged goods |
Rapid concrete | Rapid concrete light | Repair concrete | repair mortar (applicable on inclination/slope) |
XC4, XD3, XF4 | XC4, XD3, XF2 | R4 | R4 |
1-2 hours after placing | 5 hours after placing | 2 hours after placing | 1 hour after placing |
60 - 120 min (adjustable) | 90 - 180 min (adjustable) | 40 - 90 min (temperature dependent) | 15–30 min |
2h after placing | 4h after placing | 3h after placing | 2h after placing |
> 15 cm | > 15 cm | > 10 cm | > 5 cm |
batch plant, mobile mixing truck | batch plant | Site mixer (compulsory mixer), paddle mixer | Site mixer (compulsory mixer) |
Manual placement, pump, slipform paver | Manual placement, pump | Manual placement | Manual placement |
> 40 m³/h | > 40 m³/h | approx.300 l/h | approx. 250 l/h |
50 m³ | 150 m³ | 2 Pallets (approx. 1m³) | 2 Pallets (approx. 1m³) |
bulk, BigBag | bulk | 24 x 40 kg bags per pallet | 42 x 25 kg bags per pallet |
Go to product page Q-FLASH 2/20 |
Go to product page Q-FLASH 5/20 |
Go to product page Q-CON |
Go to product page Q-REP G |
Do you need help choosing the right product? Our contact persons are at your disposal.