DE
EN
FR
  • Homepage
  • Applications
    Air traffic areas Road traffic areas Bridge construction Track construction Building construction Civil engineering Tunnel construction
  • Products
    Products at a glance Rapid-hardening concrete
    Concretum® Q-FLASH 2/20 Concretum® Q-FLASH 5/20
    Dry Mixes
    Concretum® Q-CON Concretum® Q-REP G Concretum® Q-FILL
    Premium Fibers
    Concretum® SUPERFIBER FT Concretum® SUPERFIBER 40/8
    Premium admixtures
    Concretum® C-DRY Concretum® D-SOLO
  • Work preparation
    Working with rapid-hardening concrete Production of rapid-hardening concrete Your advantages
  • Technology
    Concrete Mix Designs Rapid-hardening concrete Rapid-drying concrete Shrinkage reduction concrete
  • Projects
  • About us
    Team Contact Media Publications News History - Philosophy - Values Downloads Jobs
  1. Home
  2. Projects

Projects

Olten Hammer District Connection, Concrete Roof Slab
Maintenance Works at Zurich Airport in 2026
Replacement of the SBB Bridge on Usterstrasse, Wetzikon
SBB Railway Line Lenzburg, Rapid-Hardening Concrete for Critical Signal Foundations Under Live Railway Operations
Double-Track Expansion Opfikon–Kloten
Renewal of Drainage and Sewer Infrastructure beneath the Railway Line Bachtelstrasse, Winterthur
Tram Infrastructure Renewal Walchestrasse, Zurich
Tram Paris (RATP – Paris Public Transport Operator), France
Q-CON for local repairs at Barcelona‑El Prat Airport (BCN)
Zurich Airport (ZRH) Runway Threshold Rehabilitation Runway 14/32
Show more Projects

Contact

Concretum Construction Science AG
Steinackerstrasse 56
CH-8302 Kloten

Tel: +41 44 445 13 46
info@concretum.com

 

Work preparation

Product comparison

Concrete recipes

Production of rapid-hardening concrete

Your advantages

Quicklinks

Downloadcenter

Publications

Team

Contact

© 2026 Concretum Construction Science AG

  • sitemap
  • Imprint
  • Privacy notice
  • YouTube YouTube
  • LinkedIn LinkedIn
  • Instagram Instagram