The streetcar tracks at Centralbahnplatz near Basel main station were replaced on behalf of Basler Verkehrs-Betriebe (BVB). The track excavation, re-laying and concreting at the track crossing had to be carried out during the night so the streetcar lines could resume rush-hour traffic unhindered punctually at 05:00 in the morning. The special concrete Concretum® Q-FLASH 2/20 was used to keep to the tight schedule. The set open time of 90 minutes enabled safer delivery from the concrete plant in Muttenz and there was enough time to place and vibrate the concrete.
Product
Country
Switzerland
Construction Period
2022, July – December
Client
Basler Verkehrs-Betriebe
Construction Company
Basler Verkehrs-Betriebe
Concrete Producer
Karl Meyer-Spinnler AG
Concrete Volume
165 m3
Field of application
Track construction
Paving method
Manual paving