For maintenance and renewal work on the tram tracks at Zurich Wiedikon station, the rapid-hardening concrete Q-FLASH 5/20 was used. A total of 100 m³ of concrete was installed, which was produced at the Ebirec concrete plant in Rümlang, approximately 30 minutes from the project site.
This rapid-hardening concrete achieves a compressive strength of 20 MPa in just 5 hours after installation, ensuring swift execution and minimal disruption to rail or road traffic.
The rapid-hardening concretes from Concretum Construction Science AG not only offer fast execution but also long-term durability comparable to, if not longer than, traditional concrete. This guarantees speed and longevity for an intelligent, environmentally friendly, and cost-efficient solution.
Product
Country
Switzerland
Construction Period
2025, May
Client
Verkehrsbetriebe Zürich
Construction Company
Soltermann
Concrete Producer
Betonwerk EbiRec
Concrete Volume
100 m3
Field of application
Road traffic areas, Track construction
Paving method
Manual paving